April 26, 2021

Brian Skripac Joins ENR Critical Path Podcast

Our Director of Virtual Design and Construction (VDC) Brian Skripac recently joined the ENR Critical Path Podcast to talk about innovation in the construction industry.

Specifically, Brian spoke deeply about levels of development, modular construction, how architects and contractors are creating more model-friendly contract documents that allow for better collaboration in the design and construction process, the changing world of project delivery and more.

In his role with our team, Brian continually drives innovation by focusing on the process orientation of the Building Information Modeling (BIM)-enabled VDC delivery process at CannonDesign. He has 23 years of industry experience, with the last 13 focusing on the integration of BIM and VDC to transform project delivery. Brian has successfully developed and managed BIM-enabled delivery systems for large Cannon Construction Services efforts. In addition, he focuses on the use of building information models to capture and structure relevant facility data to achieve the value a BIM-enabled VDC delivery process brings to facility owners from an interoperable lifecycle management strategy.

Listen to Brian on the ENR podcast >